
We generated a fair bit of product: Spars for the stables roof to form a floor to place hay on, wood for the charcoal stack (will be used in 2013 if not later) as well as pea sticks, bean poles and lots of lop and top to make faggots for the ovens and to repair the top pigsty roof with later this year.

We also finished the post and rail fence down the length of triangle field and dug in a post for the gate at the bottom end. We also replaced the post and rail in top orchard where the horses had got through into the coppice recently - thankfully they had not done any damage.
All in all a very successful weekend.
No comments:
Post a Comment